This three storey storage facility in Mission, provides a dual orientation. One to the access street and the other to the regional highway artery on the other side. This tilt panel construction project utilizes a playful distribution of ‘glass box’ elements on the highway frontage making its use clear visible from a significant distance. This project was delivered via the Design Build methodology.