Lasqueti View Place

Multi-Family
3022 Island Highway, Qualicum Beach, BC

This project consists of three new 3-storey condo buildings with a partial underground parking area located in Qualicum, BC. There will be approximately 22 units per building (66 units total) with one amenity space per building.

Multi-Family
Design Stage
66 Units

Kubuto Facility

Industrial
North Parallel Road, Abbotsford, BC

This new, over 30,000 sq.ft., Kubota facility includes a spacious showroom, a fully equipped service shop, and an extensive inventory of Kubota machines and parts.

Industrial
Completed 2026
30,000 sq.ft.

Marquis 2

Multi-Family
5300 Clover Bar Road, Sherwood Park, AB

This project consists of a 6-storey, 71 unit apartment building in Sherwood Park, AB.

Multi-Family
Under Construction
71 Units

Vernon Townhomes

Townhouses
15th Avenue, Vernon, BC

The District Townhomes are an up and coming community of contemporary
homes located in Vernon, BC. A collection of 48 three bedroom, two-level
townhomes in the heart of Vernon’s family-friendly Hillview neighbourhood.
Homes are surrounded by beauƟful natural landscapes and rich with
amenities.

Townhouses
Under Construction
- not available -

Rugby Park

Multi-Family
10950 Ellerslie Road SW, Edmonton, AB

Preliminary design for this new multi-family residential development in Edmonton, AB.

Multi-Family
Design Phase
TBC

Union Road Mixed-Use

Multi-Family
1975 Union Road, Kelowna, BC

This project consists of a 24 Unit, four-storey mixed-use commercial/residential building. The main floor will consist of commercial area with residential area on the floors above.

Multi-Family
Design Stage
28,000 sq.ft.

White Rock Mixed-Use

Multi-Family
15869 Pacific Ave, White Rock, BC

Preliminary design for this new multi-family residential development in White Rock, BC.

Multi-Family
Design Phase
TBC

Maple Ridge Seniors Housing

Senior Living
22534/22548/22556 Royal Crescent, Maple Ridge, BC

This project consists of a 6-storey seniors housing facility with a total of 98 units. We are proud to be working with New Vista Society and BC Housing to bring much needed affordable rental housing to seniors in Maple Ridge, BC.

Senior Living
Design Phase
55,000 sq.ft.

Mt. Lehman Crossing

Retail
2871 Livingstone Avenue, Abbotsford, BC

Red Valley Enterprises engaged Krahn Group to design and consult on the development of the commercial property located in West Abbotsford. Located in the developing Mt. Lehman District, Mt. Lehman Crossing is located on a high visibility commercial property along Hwy #1.

Anchored by major tenants including Shoppers Drug Mart, TD Bank, Scotiabank, Starbucks, and Popeyes Louisiana Kitchen, the first phase of this development is completed. Phase 2 is currently under construction.

Retail
Phase 1 Completed 2014
Phase 2 Under Construction
27,000 sq.ft. (Phase 1)
16,000 sq.ft. (Phase 2)

Auguston Station

Multi-Family
36363 Auguston Parkway, Abbotsford, BC

Auguston Station Residences consist of 31 unit, 3-storey, apartment building with 1 level of underground parking.

Multi-Family
Design Stage
60,000 sq.ft.