Beedie Industrial
The Krahn Group was hired by Beedie Construction Ltd. to design this concrete tilt-up industrial building in the Gloucester Industrial Park located in Langley, BC. The building also includes a two level office area.
The Krahn Group was hired by Beedie Construction Ltd. to design this concrete tilt-up industrial building in the Gloucester Industrial Park located in Langley, BC. The building also includes a two level office area.
The project consists of a light industrial indoor recreational service center located in St. Albert, Campbell Business Park North. The building is comprised of approximately 47,984 sq.ft. of recreation space, 5,000 sq.ft. of office space and 1,650 sq.ft. of mezzanine area.
Krahn Group was hired by Wesgroup Properties to provide design and engineering services for this two building multi-tenant concrete tilt-up industrial development on a 8.5 acre site located just north of the Hwy #1 and Mt. Lehman interchange. The site offers high exposure to the Mt. Lehman area for industrial users.
This development consists of a 203,175 sq.ft. concrete tilt-up multi dock loading warehouse/distribution center in the Tilbury industry park in Delta, BC, Canada. Tilt wall panels to the exterior of the building in conjunction with two internal brace lines provide the lateral support system. The gravity system is provided by the tilt wall panels to the perimeter of the building with internal structural steel framing consisting of beams and columns (supported off reinforced concrete foundations) providing support to the open web steel joists and metal roof decking. The ground floor consists of an 8” thick slab on grade. During construction a 50 ft. wide section of the perimeter floor slab was placed as the casting bed for the tilt wall panels. The remainder of the floor slab was placed at the end of the project after the underground services were completed and the building was fully watertight. This allowed for the easy addition of the trench and catch basins to the floor slab which were required by the single tenant user who was not identified until well into the project build. The tilt wall panels to the front elevation of the building consist of spandrel panel legs at the locations of the window openings to allow for the continuation of the spandrel glazing system as required for the architectural design of the building. The erection of the tilt wall panels was carried out in three separate lifts which allowed for a third of the building to be erected, structural steel and metal decking installed up to the internal brace lines allowing for the tilt wall braces to be removed and used for the next phase of the tilt.
Krahn Group was hired to provide design and engineering services for this 75,000 sq.ft. industrial warehouse building with an approximate two-storey, 10,000 sq.ft. (5,000 sq.ft. per floor) office area.
This industrial building is located in the highly desirable Campbell Heights North Business District. It consists of a multi-tenant strata warehouse building with a portion of the building to be occupied by Powerhouse Building Solutions. Features include high glazing, one grade and two dock loading doors.
Krahn Group was hired to provide design and engineering services for this three building multi-tenant industrial development located in the Mt. Lehman area. The buildings were constructed using uninsulated concrete tilt-up panels.