Bailey West

Industrial
3635 - 190 Street, Surrey, BC

This project is another addition to the Campbell Heights Industrial area and provides a manufacturing, office, and distribution space for Bailey Metals. The 104,000 sq.ft. concrete tilt-up facility situated on 7 acres comes equipped with custom racking options and a two-level office space. A statement staircase in the lobby and numerous details throughout the building were installed to showcase the clients products.

Industrial
Completed 2019
112,500 sq.ft.

Osprey Landing

Multi-Family
3090 Burtch Road, Kelowna, BC

Osprey Landing is a three-storey, 48 unit condominium building with underground parking.

Multi-Family
Completed 2019
47,727 sq.ft.

The Ridge Condos

Multi-Family
17 Columbia Avenue West, Devon, AB

The Ridge is Devon’s first condominium development. It is a 4-storey, wood frame building consisting of 32 units with one level of underground parking.

Multi-Family
Completed 2018
38,516 sq.ft.

Delair Townhouses

Townhouses
34825 Delair Road, Abbotsford, BC

The Delair Townhouses consist of 29 units resoluting in a 22,000 sq.ft. development.

Townhouses
Completed 2018
22,000 sq.ft.

12 Unit Townhouse

Townhouses
32138 George Ferguson Way, Abbotsford, BC

This project consists of a 12 unit townhouse development complex located in Abbotsford, BC.

Townhouses
Completed 2018
7,403 sq.ft.

Lightworks Building

Office
22 East 5th Avenue, Vancouver, BC

The project consists of a 5-storey commercial building complete with office space and 2 levels of parking.

The Lightworks Building was conceived from the ground up to pay homage to the site’s electrical factory roots and importance to Vancouver’s history, while inspiring a new generation of entrepreneurial energy. The building’s Art Deco heritage is preserved not only in the poured-inplace concrete frontage that wraps around the entire front corner of the site, but in the very identity and future of The Lightworks Building itself.

Office
Completed 2018
45,500 sq.ft.

Harvest Industrial Park

Industrial
3495, 3497, 3499 - 63 Avenue, Leduc, AB

Located in Leduc’s aggressively expanding Industrial Area, the Harvest Business Park will prove to become a landmark street of industrial units. Designed with a sleek modern exterior facade, built using tilt-up concrete these facilities will prove to be iconic in the area.

Industrial
Completed 2018
140,000 sq.ft. (6 buildings)

Westland Professional Centre

Office
2752 Sunridge Way NE, Calgary, AB

This project consists of a 3-storey medical and general office building complete with an underground parkade and penthouse service room.

Office
Completed 2018
70,000 sq.ft.

Points West Living – Phase 1

Senior Living
1713 Strachan Road SE, Medicine Hat, AB

Points West Living is a Phase 1 of 3-phase project. 6-storey, 120-unit seniors living facility with amenity spaces and a 57-stall single level underground parkade.

Senior Living
Completed 2018
160,000 sq.ft.

Riverbend Business Park

Industrial
Burnaby, BC

The Krahn Group was hired to provide the structural engineering services on several industrial projects located in the Riverbend Business Park in Burnaby, BC.

  • Riverbend Building 1: One-storey concrete tilt-up, approx. 152,000 sq.ft.
  • Riverbend Building 2: One-storey concrete tilt-up, approx. 119,000 sq.ft.
  • Riverbend Builidng 4: One-storey concrete tilt-up, approx. 208,000 sq.ft.
Industrial
Completed 2018
479,000 sq.ft.