Conwest Kingsway

Industrial
1579 Kingsway Avenue, Port Coquitlam, BC

This project consists of 2 identical concrete tilt-up industrial buildings consisting of warehouse and office area.

Industrial
Completed 2019
200,000 sq.ft

Cherry Hill Townhomes

Townhouses
33209 Cherry Avenue, Mission, BC

This townhouse development consists of 58 family-focused townhomes in the Cherry Hill area of Mission, BC.

Townhouses
Completed 2019
58 Units

GO RV Sales Centre

Dealerships
13120 Yellowhead Trail NW, Edmonton, AB

Go RV was a Design / Build project with OML Construction. The project figures prominently along 13120 Yellowhead Highway near St. Albert Trail.

The project is an expansion and renovation of the existing facility that featured a number of new service bays and a renovation and upgrade to the building façade that included for expansive curtainwall glazing to feature the vehicles in the Showroom. The large fin with orange trim figures prominently along the Yellowhead Highway and also locates the main entrance to the showroom. The total area of the existing building and expansion area was 33,380 sq.ft. that includes for the Detail Shop and the Mezzanine. Of significance with this project was the number of parking stalls that were required. Whereas the total number of stalls required to comply with the Zoning By-Law, there were 1,533 parking stalls provided.

Dealerships
Completed 2019
33,380 sq.ft.

Subzero Cold Logistics

Cold Storage
2525 - 188 Street, Surrey, BC

Subzero Cold Logistics is the first integrally insulated tilt-up freezer building in Western Canada. The 42,066 sq.ft. building is an insulated concrete tilt-up freezer storage facility that is designed to maintain temperatures at -25 degree Celsius (-4 degree Fahrenheit) to store frozen foods. The entire warehouse has been equipped with state-of-the-art racking systems to ensure the entire space can be utilized. The building also boasts a wide range of additional structural, thermal, moisture, and maintenance benefits associated with the use of insulated tilt-up construction.

This building won the Tilt-Up Achievement Award in 2019.

Cold Storage
Completed 2019
42,066 sq.ft.

Centra Commercial

Retail
9347 - 200A Street, Langley, BC

This project consists of two concrete tilt-up multi-tenant commercial buildings. Building 1 is approx. 40,000 sq.ft. and Building 2 is approx. 30,000 sq.ft.

Retail
Completed 2019
70,000 sq.ft.

Three Robins Active Living

Senior Living
48 Avenue & 45 Street, Red Deer, AB

An 88-unit, six-storey apartment building, this building includes 1 level of underground parking with a heated lamp, a multi-purpose room, kitchen, cafe, lobby, lounges, guest laundry, a workshop and public washrooms.

Senior Living
Completed 2019
95,647 sq.ft.

Ironworks Building

Industrial
220 Victoria Drive, Vancouver, BC

Ironworks is a mixed-use light industrial and office complex encompassing an entire city block in Vancouver’s re-emerging portown district. The overall form of the project is a functional response to the site topography and the requirements of the anticipated users. The industrial functions are expressed in durable and economical cast in place and precast concrete construction with a lighter, more transparent expression being employed for the office floors which float above the Pandora building with a contrasting steel frame clad in glass and metal panels.

Industrial
Completed 2019
207,000 sq.ft.

Kingston Mixed-Use

Industrial
9349 - 194 Street, Surrey, BC

This project consists of a concrete tilt-up, mixed-use building to have a total gross floor area broken down into 3 sections; 2,000 Sq.ft. storage area, 6,100 Sq.ft. main floor office area and 6,100 Sq.ft. of 2nd storey office area.

Industrial
Completed 2019
14,200 sq.ft

Lustre Products

Industrial
43650 Progress Way, Chilliwack, BC

Lustre Products is a 62,000 sq.ft. manufacturing/office facility that specializes in manufacturing elevator parts and accessories. The exterior façade of the office delivers the flagship characteristics for the building, utilizing curtain wall system installed at a 75-degree angle. The interior of the office is furnished with numerous high-end features such as:

  • Glass office partitions
  • Frame less glass sliding office doors
  • Porcelain tile & concrete feature walls
  • Architectural steel/glass stairs
  • Polished concrete floors
  • Unique ceiling design complemented with designer light fixtures
  • Exterior glazing that maximizes glare and solar heat gaine reesistance

The building was constructed using insulated concrete tilt-up wall panels and won the Tilt-Up Achievement Award in 2019.

Industrial
Completed 2019
62,000 sq.ft.

Gill Estates

Multi-Family
480 Crystallina Nera Drive, Edmonton, AB

Gill Estates apartment complex consists of 2, four-storey wood frame apartment buildings with a total of 213 units. The larger apartment building (115 units) is to be on slab-on-grade, and the smaller apartment building (98 units) is constructed over an underground parkade for approximately 98 cars.

Multi-Family
Completed 2019
222,000 sq.ft.