Velo Delta

Industrial
7400 Vantage Way, Delta, BC

This development consists of a 203,175 sq.ft. concrete tilt-up multi dock loading warehouse/distribution center in the Tilbury industry park in Delta, BC, Canada. Tilt wall panels to the exterior of the building in conjunction with two internal brace lines provide the lateral support system. The gravity system is provided by the tilt wall panels to the perimeter of the building with internal structural steel framing consisting of beams and columns (supported off reinforced concrete foundations) providing support to the open web steel joists and metal roof decking. The ground floor consists of an 8” thick slab on grade. During construction a 50 ft. wide section of the perimeter floor slab was placed as the casting bed for the tilt wall panels. The remainder of the floor slab was placed at the end of the project after the underground services were completed and the building was fully watertight. This allowed for the easy addition of the trench and catch basins to the floor slab which were required by the single tenant user who was not identified until well into the project build. The tilt wall panels to the front elevation of the building consist of spandrel panel legs at the locations of the window openings to allow for the continuation of the spandrel glazing system as required for the architectural design of the building. The erection of the tilt wall panels was carried out in three separate lifts which allowed for a third of the building to be erected, structural steel and metal decking installed up to the internal brace lines allowing for the tilt wall braces to be removed and used for the next phase of the tilt.

Industrial
Completed 2021
203,000 sq.ft.

Woody’s Rv Dealership

Dealerships
31708 Marshall Road, Abbotsford, BC

Krahn Group designed this four storey, 65,000 sq.ft. recreation vehicle dealership consisting of a showroom with significant glazing areas opening onto a major collector street in Abbotsford, BC. This project utilizes several key construction technologies including precast and CIP concrete, steel framing as well as mass timber structural elements. The project includes wash bays, multiple service bays, office spaces, and customer amenity areas. It is currently nearing completion and occupancy. This project is being delivered via the Design/Build methodology. The Krahn Group of Companies has provided all integrated design disciplines on this project.

Dealerships
Completed 2021
65,000 sq.ft.

Lok N’ Store Self Storage

Self Storage
31491 Gill Avenue, Mission, BC

This recently completed three storey storage facility in Mission, provides a dual orientation. One to the access street and the other to the regional highway artery on the other side. This tilt panel construction project utilizes a playful distribution of ‘glass box’ elements on the highway frontage making its use clear
visible from a significant distance. This project was delivered via the Design Build methodology.

Self Storage
Completed 2020
63,000 sq.ft.

Spire Professional Centre

Office
8029 - 199th Street, Langley, BC

Spire Professional Centre in Langley is a Class A strata office building located off of the busy 200th Street Corridor and Highway 1 Interchange. The building consists of three storey concrete tilt-up construction and includes special concrete panel and glazing features. The building boasts secured underground parking, bike storage, electric vehicle charging stations and a world-class security system.

Office
Completed 2020
51,785 sq.ft.

Access Mini Storage

Self Storage
7455 Vedder Road & 8989 Charles Street, Chilliwack, BC

Krahn Group was hired to design this new three-storey concrete tilt-up mini-storage facility on a 1.6 acre site located in Chilliwack, BC.

Self Storage
Completed 2020
70,000 sq.ft

Super Save Group

Industrial
3613 - 190 Street, Surrey, BC

This 90,00 sq.ft. facility contains 10,000 sq.ft. of office space over 2 floors with the balance of space containing warehouse, vehicle and equipment maintenance areas.

Industrial
Completed in 2020
90,000 sq.ft.

Cancorr Industries

Industrial
3030 – 190 Street, Surrey, BC

Krahn Group was hired to provide design and engineering services for this 75,000 sq.ft. industrial warehouse building with an approximate two-storey, 10,000 sq.ft. (5,000 sq.ft. per floor) office area.

Industrial
Completed 2020
75,000 sq.ft.

Auto West BMW

Dealerships
4331 Vanguard Road, Richmond, BC

This project consists of a 3-storey reinforced concrete structure with showroom built on the 3rd level in steel framing. It can store up to 300 vehicles within the structure and has 122,000 sq.ft. of usable area.

Dealerships
Completed 2020
122,000 sq.ft.

Chappelle Square

Retail
3704 - 141 Street, Edmonton, AB

Chappelle Square provides 68,000 sq.ft. of commercial space to support the local community. This commercial development comprises of five buildings on a 3.5 acre site in Edmonton, AB.

In addition to the design of the project, Krahn also provided the Tendering and Contract Management for the project.

Retail
Completed 2020
68,000 sq.ft. (5 buildings)

Powerhouse Warehouse

Industrial
3757 - 190th Street, Surrey, BC

This industrial building is located in the highly desirable Campbell Heights North Business District. It consists of a multi-tenant strata warehouse building with a portion of the building to be occupied by Powerhouse Building Solutions. Features include high glazing, one grade and two dock loading doors.

Industrial
Completed 2020
66,250 sq.ft.