Prologis Tapscott DC4 & DC5

Industrial
985 Passmore Avenue & 3825 McNicoll Ave, Toronto, ON

Krahn provided the structural design for two, single-storey industrial warehouse buildings in Scarborough, ON. The warehouses are constructed out of structural steel with non-load bearing concrete precast walls.

Industrial
Completed 2025
130,500 sq.ft. and
215,000 sq.ft.

Royal Center Aster

Retail
17 St Aster Blvd., Edmonton, AB

This development consists of three (3) new commercial retail buildings on the Royal Centre Aster site located in southeast Edmonton. Building 1 will be a 10,500 sq.ft. CRU general retail building with a daycare yard. Building 2 will be a 2-storey retail/professional building, the main floor will be 15,750 sq.ft. and the 2nd floor will be 10,300 sf with over 4,000 sq.ft. of outdoor patios. Building C will be a shell building for a 4,400 sq.ft. gas station convenience store.

Retail
Completed 2025
42,000 sq.ft.

The Ridge Condos

Multi-Family
11903 Burnett Street, Maple Ridge, BC

The Ridge is a new 5-storey residential market development in the heart of Maple Ridge. Thoughtfully designed to complement the evolving urban fabric of the city, The Ridge offers a welcoming community of 1 & 2-bedroom homes, just steps from downtown conveniences.

Multi-Family
Completed 2025
50 Units

Elevate Industrial

Industrial
11 King Edward Street, Coquitlam, BC

11 King Edward is located at one of the most highly sought after Industrial pockets of Coquitlam. Offering prominent exposure on the corner of King Edward and United Boulevard this flexible M-1 zoned space provides a wide array of heavy and light industrial uses. This excellent logistical location is in close proximity to major transportation routes including Highway 1, Lougheed Highway, and Brunette Avenue offering service to downtown Vancouver in just 25 minutes. Both the East and West markets can be served from this location with the new King Edward Overpass adding to this highly desirable location.

Industrial
Completed 2025
100,000 sq.ft.

Vanguard Industrial

Industrial
4720 & 4740 Vanguard Road, Richmond, BC

Vanguard Industrial consists of two concrete tilt-up multi-storey industrial buildings with a hollow core second floor system.

This development is the first stacked industrial development with two modern designed commercial and industrial buildings. Each building has two levels with a large mezzanine in each unit.

Industrial
Completed 2024
431,872 sq.ft.

Squamish Self Storage

Self Storage
34980 & 34920 Queens Way, Squamish BC

This two phase development establishes an engaging and playful exterior design which is at once attractive and memorable making this self-storage facility a recognized destination in the town of Squamish and in the region. The warmth of wood grain combines with the strength and durability and security of tilt panel construction. Design Build delivery process. On time and on budget.

Self Storage
Phase 1 Completed 2020
Phase 2 Completed 2024
Phase 1 is 100,000 sq.ft.
Phase 2 is 95,000 sq.ft.

Union Road Mixed-Use Building in Kelowna

Multi-Family
1975 Union Road, Kelowna, BC

This project consists of a 24 Unit, four-storey mixed-use commercial/residential building. The main floor will consist of commercial area with residential area on the floors above.

LPA Inc (now KP Architecture Ltd.)
Multi-Family
2024 - Design Stage
28,000 sq.ft.

Pacific Corporate Centre

Industrial
19543 - 34A Ave, Surrey, BC

Pacific Corporate Centre is a 19 acre site in Surrey’s Campbell Heights. The development consists of two light industrial tilt-up buildings totaling 458,000 sq.ft. of space.

Industrial
Completed 2023
458,000 sq.ft.

Epcor Goldbar Wastewatertreatment Plant Hvac Upgrades

Cold Storage
Edmonton, AB

This project involves the renovation and addition to an existing building on the Goldbar site. Our team provided the structural, mechanical, electrical, and civil engineering services for this significant renovation project. The project includes the addition of a control room, converting existing offices and support spaces into change rooms, new office spaces, and classroom areas. Additionally, sprinklers will be added to the entire building.

Our mechanical team designed the new HVAC, sprinkler, plumbing systems, service upgrade, and BMS for the building. To ensure the new systems will support the building operations our team conducted a thorough analysis of the existing system for capacity to ensure it’s ability to handle the increased loads. The new mechanical systems are designed to tie into the existing infrastructure including the existing sanitary and storm sewer, HVAC systems, and the addition of new water service to the building. KD Mechanical’s scope also included:

  • A new controls system for the building to connect to the existing site wide controls system.
  • A new HVAC unit to serve the control room which operates 24/7.
  • New water heaters.

KM Civil’s scope included the following:

  • Review of existing utilities alignments onsite and offsite.
  • Review of stormwater Management requirements and overland drainage for the development.
  • Integrate and accommodate new building into the existing infrastructure.
  • Provide new water service connection to the building.
  • Provide design for new raised pararamp into the building.
  • Construction Administration and Field Reviews.
Cold Storage
Completed 2023
- not available -

Burke Place Townhomes

Townhouses
3503 Gislason Avenue, Coquitlam, BC

This townhouse development consists of 16, three-storey units located in Coquitlam, BC.

Townhouses
Completed 2023
- not available -